RIVETEnergy
Credits

Image attribution

Photography on this site is used under Creative Commons licenses. Attribution is required by those licenses and is given here.

ImageCreatorLicenseSource
Boiler Room OnejoemacjrCC BY 2.0View
Pueblo Chemical Agent-Destruction Pilot Plant Static Detonation Chamber Support Equipment (50189285077)PEO ACWACC BYView
Ductwork and mechanical services in a commercial buildingWolfmannCC BY-SA 4.0View
Mitsubishi Electric MUZ-FD25VABH room air conditionerSanteri ViinamäkiCC BY-SAView
Row of large commercial rooftop HVAC units on a building roofPEO ACWACC BY 2.0View
Hotel building exteriorMark Hogan from San Francisco, California, USACC BY-SA 2.0View
Commercial rooftop air handling plantPEO ACWACC BY 2.0View
auguste perret, architect: 25 bis rue franklin apartment building, paris 1903-1904seier+seierCC BY 2.0View
Jersey City Skyline September 2025 038 (cropped)Kidfly182CC BYView
Steel office buildingSteelMaster BuildingsCC BY-SA 2.0View
Hotel facade with through-wall PTAC units at every windowJoseph Gonzalez miracletwentyoneCC0View
Retail shopping center exteriorMichael RiveraCC BY-SA 3.0View
Packaged commercial rooftop HVAC unit installed on a flat roofP199Public domainView
Meier & Frank Warehouse building, Portland, OR 2012Another BelieverCC BY-SA 3.0View
High-voltage power lines in Mercer County Park, Lawrence, New JerseyFamartinCC BY-SA 3.0View
PSE&G Lawnside Substation, New JerseyTonyglen14CC BY 2.0View
Itron OpenWay electricity meter at an apartment complexDwight BurdetteCC BY 3.0View
Utility meters outside a mill building in Nashua, New HampshireMarkBuckawickiCC0 1.0View
Packaged rooftop HVAC unit lifted by crane over an office building roof, Los Angeles Air Force BaseLos Angeles Air Force Base Space and Missile Systems Center (U.S. Air Force)Public domainView
Air handling units in the basement mechanical room of a federal building in Los AngelesCarol M. Highsmith, Library of CongressPublic domainView
Boiler room in a high schoolBraedencapaulCC0View
Air conditioning units on the roof of a hospital building, Strathpine, QueenslandKgboCC BY-SA 4.0View
New air handling units and copper piping on the roof of a ventilation building in New York CityMTA Capital Construction Mega ProjectsCC BY 2.0View
NJ energy rebates 2026 for commercial and multifamily HVAC: bonus offers end December 31, 2026, program rules run to June 30, 2028, with PSE&G, Atlantic City Electric, JCP&L and gas utility rebate ratesRivet EnergyCC Original graphic—
How long a commercial HVAC upgrade takes to pay back in NJ: payback equals cost minus incentive divided by yearly energy saving, shown falling from 8 years to 1.6 years as NJ utility incentives rise from 0% to 80%Rivet EnergyCC Original graphic—
Condensing vs non-condensing boilers: condensing needs 80–120°F return water; NJ gas utilities pay $9, $5 or $4 per MBHRivet EnergyCC Original graphic—
Electric boiler vs heat pump for NJ commercial buildings: resistance heat is COP 1.0 with no utility incentive; heat pumps earn $2,500 to $6,480 per tonRivet EnergyCC Original graphic—
Heating retrofit options for older NJ apartment buildings: new boiler plant, PTAC to PTHP, or heat pump conversion, with the per-MBH, per-unit and per-ton incentives each earnsRivet EnergyCC Original graphic—
CallText